The beginning
This covered space came with the property when we purchased it in 2002. We park one car on the left, and the rest has been pretty useless ever since. The street runs parallel to the wall at the right.
Sand and bags of cement arrive.
More material arrives. Stones
Note that the red tile above the gate at right has been removed. It will be replaced more securely.
Tenches for foundations of two new walls
These trenches are about 18 inches deep. They were filled with cement.
Excavation for bathroom foundation.
The septic tank will go beneath here too.
Walls start up
Glass bricks included in the walls.
Wall going up.
This is the wall that will abut the parking spot.
Wall with glass bricks.
At the far end you see the wall of the separate bath going up.
Bath at right.
Day 8
Day 9
Concrete, horizontal column installed just below tile roof and above the bricks. There is also a vertical one at the bathroom corner.
Interior
The stucco is going up on the interior walls.
Fuses
This had to be temporarily moved. It's the fuse box for all the electricity coming into the Hacienda.
Roof comes off
The roof/ceiling will be upgraded, and an additional level of wood added. Then the roof tiles will be put on top of that.
roof No. 2
Day 12
Day 10
Preliminary stucco on walls
Electric conduits, water pipes
These are embedded into wall. Later, they will be covered with stucco.
Electric conduits, gas lines too.
Plywood subroofing
The traditional red clay tiles will go on top of this.
Roof tiles are replaced.
Second story
Water tank will sit atop the lavatory. Brick wall will hide it.
Tractor for septic tank hole
Septic tank excavation
Hole is about 10 feet deep.
Septic tank progress
septic tank
Rebar over septic tank cover
cement over septic tank
Lavatory door
Ceramic tile floor installed
Near done
Bath peek
Yellow wsink
Cesspool
Cesspool interior
Entrance to street
Sliding gate
inside
lavatory
kitchen
done
outside
Scroll To Top

Comments

No comments yet...

All fields are required, fill in the form.

Comment successfully added.

Comment



Read  
Date 
Dimensions 
Size 
File 
Camera
ISO Speed
Exposure
Aperture
Focal Length
Flash
Display Image Quality
Tags
Keyboard Shortcuts
Next Photo
Previous Photo
LLike
CComment
VFavorite
SShare
FFull Size
HHide Info
GSwitch to Grid (Square) View
ESCClose
Audio Mute
Prev
Play
Next
Shuffle
Shuffle photos
Include
Include Sub-albums
Click to change slide duration time (3-10 seconds)
The beginningSand and bags of cement arrive.More material arrives. StonesTenches for foundations of two new wallsExcavation for bathroom foundation.Walls start upWall going up.Wall with glass bricks.Bath at right.Day 8Day 9InteriorFusesRoof comes offroof No. 2Day 12Day 10Electric conduits, water pipesElectric conduits, gas lines too.Plywood subroofingRoof tiles are replaced.Second storyTractor for septic tank holeSeptic tank excavationSeptic tank progressseptic tankRebar over septic tank covercement over septic tankLavatory doorCeramic tile floor installedNear doneBath peekYellow wsinkCesspoolCesspool interiorEntrance to streetSliding gateinsidelavatorykitchendoneoutside